GA are currently working with ISG PLC at No 6 St. Pancras which is one of 3 custom built buildings that house Google’s UK headquarters. Part of the Red Dwarf framework, this is a two year contract that ISG have secured. Two new production studios for Google’s clients to utilise are being built and GA are providing the mechanical ventilation, chilled water and condensate modifications and supply of new air handling which involves installing a new fan coil unit.
March 28th, 2017
Leave a Reply