Chester House
We were contracted to undertake these works by our client Grangewood. On this project we were asked to install 12 x 5” seamless steal ducts from the road outside the building to the new substation room to allow UK Power Networks to pull their cable through. We also had to re-route numerous rainwater services in black time-saver pipework of various sizes and also re-route 3 x 4” ensign pipes for waste water from the flats above the new sub-station.
Re-routing of cast iron soil stack to make way for a new sub-station.